The 18 elements

#ElementContent
1Design recordsCustomer drawing / CAD with every characteristic ballooned; supplier design records if design-responsible
2Authorized engineering change documentsChanges not yet on the drawing (ECN, deviation)
3Customer engineering approvalEngineering approval when the customer requires it (e.g. validation tests)
4Design FMEAIf the supplier is design-responsible
5Process flow diagramEvery step from receiving to shipping, incl. rework and inspection
6Process FMEALinked to the flow diagram, AIAG-VDA method or as the customer requires
7Control planProduction control plan matching PFMEA and flow
8MSA studiesGage R&R, bias, linearity, stability for new or modified gauges; attribute agreement
9Dimensional resultsEvery drawing characteristic measured on the sample parts (often 5 parts per cavity / process stream)
10Material and performance test resultsChemical, physical, metallurgical and functional tests per drawing and specifications
11Initial process studiesPpk (or Cpk) for special characteristics, >= 100 readings, 25+ subgroups
12Qualified laboratory documentationLab scope and accreditation (ISO/IEC 17025 for external labs)
13Appearance approval reportFor parts with appearance requirements (colour, grain, gloss)
14Sample production partsFrom the significant production run
15Master sampleRetained, signed sample for training and reference
16Checking aidsFixtures and gauges specific to the part, with MSA and calibration
17Customer-specific requirementsRecords for each applicable CSR
18Part submission warrantSummary declaration signed by an authorized person

Requirements by level (S submit, R retain, * customer defines)

#ElementL1L2L3L4L5
1Design recordsRSS*R
2Engineering change documentsRSS*R
3Customer engineering approvalRRS*R
4Design FMEARRS*R
5Process flow diagramRRS*R
6Process FMEARRS*R
7Control planRRS*R
8MSA studiesRRS*R
9Dimensional resultsRSS*R
10Material / performance resultsRSS*R
11Initial process studiesRRS*R
12Qualified laboratory documentationRSS*R
13Appearance approval reportSSS*R
14Sample production partsRSS*R
15Master sampleRRR*R
16Checking aidsRRR*R
17Customer-specific requirementsRRS*R
18PSWSSSSR

Level 3 is the default unless the customer specifies otherwise. Retained items must be available on request and kept for the part's active life plus one year (IATF 7.5.3.2.1).

When a PPAP is required

New part or product; correction of a discrepancy on a previous submission; product modified by an engineering change; change of material or construction; tooling transfer, replacement or refurbishment; new or rearranged equipment; change to manufacturing process or method; change of sub-supplier or material source; production from tooling inactive for 12 months or more; change of test or inspection method; change of manufacturing site. Notify the customer before the change; the customer may waive submission, but records are still updated.

More in Quality Management & ISO 9001

8d-problem-solving-report-writer

Write and review 8D problem-solving reports for customer complaints and serious nonconformities (automotive and aerospace practice: Ford Global 8D, VDA, GM, Stellantis formats): D0 emergency response, D1 cross-functional team and champion, D2 problem description with 5W2H and is / is-not and no cause in the statement, D3 interim containment within 24 hours with verification and clean point, D4 verified occurrence and escape (non-detection) root causes plus systemic cause, D5 permanent corrective actions for each cause verified before implementation, D6 implementation, validation with production data and removal of containment, D7 PFMEA, control plan and read-across to similar products, D8 closure and recognition. Checks an 8D discipline by discipline for missing content, human-error root causes, missing escape cause or action, late containment and dates out of order.

acceptance-sampling-plan-selector

Select and evaluate acceptance sampling plans for incoming, in-process and final inspection: ANSI/ASQ Z1.4 / ISO 2859-1 single sampling under normal inspection (code letter from lot size and inspection level I, II, III, S-1 to S-4; sample size, Ac and Re from AQL, following the table's arrows to the correct plan; 100% when n reaches the lot size; AQLs above 10 per 100 units), operating characteristic curves (Pa at any quality, producer's quality level, indifference point, LTPD, AOQ and AOQL, binomial or hypergeometric), plans designed from producer and consumer risk, and c = 0 zero-acceptance plans. Covers AQL choice by defect class, switching rules between normal, tightened and reduced inspection, when sampling is not appropriate, and random sampling.

approved-supplier-list-manager

Manage and audit an approved supplier list (ASL) / external provider register for ISO 9001 8.4.1, IATF 16949 8.4 and AS9100 8.4.1: supplier status (approved, conditional, probation, pending, disqualified), scope of approval by commodity and process, risk class, certification and expiry, re-evaluation intervals by risk, conditions with end dates, single-source contingency, approver and customer-directed sources. Audits the list for expired or expiring certificates, overdue re-evaluations, conditional or probation status past its decision date, high-risk suppliers without the required certification, single-source suppliers without backup and missing approvers, and checks purchase orders for suppliers that are off-list, disqualified or pending, or buying outside the approved scope. Covers ERP blocks, PO requirements, off-list and emergency purchases.

apqp-phase-planner

Plan and track Advanced Product Quality Planning (AIAG APQP 3rd edition, IATF 16949) for a new or changed automotive part: back-schedule the five phases (plan and define, product design, process design, product and process validation, launch and feedback) from the start-of-production date by program complexity, with overlap, PPAP lead and safe-launch period; list the deliverables and gate for each phase (DFMEA, DVP&R, feasibility, process flow, PFMEA, control plans, MSA, Ppk, run at rate, PPAP, safe launch, lessons learned); adjust for build-to-print suppliers; flag compressed timelines and late or untracked deliverables against a status list. Covers gate reviews, red/yellow/green status reporting, run at rate and safe-launch exit criteria.

as9100-gap-analyzer

Run an AS9100D / EN 9100:2018 gap analysis for aviation, space and defence suppliers on the requirements added to ISO 9001: on-time delivery and conformity focus, management representative, ethics and human-factors awareness, operational planning and operational risk management, configuration management, product safety, counterfeit-part prevention, special requirements, critical items and key characteristics, external provider register and flow-down, FOD prevention, tooling and NC program control, special process validation, first article inspection (AS9102), traceability, in-service data and nonconforming product control. Generates and scores a worksheet, grades missing core controls as major, and checks invalid n/a claims. Covers AS9101/AS9104, OASIS, AS9102 FAI forms, counterfeit standards (AS5553, AS6174, AS6081), NADCAP and the planned IA9100 transition.

audit-report-writer

Write internal, supplier and pre-certification audit reports with the content ISO 19011:2018 6.5 expects: audit objectives, scope, criteria with revisions, dates, team and auditees, method and sampling statement, specific strengths, findings table and three-part finding details (requirement, evidence, statement), conclusion on the degree of fulfilment of criteria, diverging opinions, follow-up deadlines and distribution. Builds a Markdown report from a JSON audit record, generates the conclusion from the findings (major / minor / none) and flags reports missing required content or findings without clause or evidence. Covers conclusion wording, closing meetings, response expectations and verifying corrective actions.