acceptance-sampling-plan-selector

Select and evaluate acceptance sampling plans for incoming, in-process and final inspection: ANSI/ASQ Z1.4 / ISO 2859-1 single sampling under normal inspection (code letter from lot size and inspection level I, II, III, S-1 to S-4; sample size, Ac and Re from AQL, following the table's arrows to the correct plan; 100% when n reaches the lot size; AQLs above 10 per 100 units), operating characteristic curves (Pa at any quality, producer's quality level, indifference point, LTPD, AOQ and AOQL, binomial or hypergeometric), plans designed from producer and consumer risk, and c = 0 zero-acceptance plans. Covers AQL choice by defect class, switching rules between normal, tightened and reduced inspection, when sampling is not appropriate, and random sampling. Use when setting up incoming inspection, picking an AQL plan, checking whether a plan protects against bad lots, or answering a customer's c = 0 requirement.

Manufacturing & Industrial Operations / Quality Management & ISO 9001v1.0.0Updated OCT 25 20262 references2 scripts

A sampling plan is a risk trade: the AQL says what quality passes most of the time, the OC curve says what bad quality still slips through. scripts/z14_plan.py reads ANSI/ASQ Z1.4 (normal inspection) correctly, including the arrows that change the sample size; scripts/oc_curve.py shows the protection a plan gives, designs plans from producer and consumer risks, and sizes c = 0 plans.

Trigger Conditions

Activate this skill when the user:

  • Needs a sampling plan for incoming or final inspection, or asks "how many do I check from a lot of N?"
  • Uses Z1.4 / ISO 2859-1 and wants the code letter, n, Ac, Re
  • Wants to know whether a plan protects against bad lots (OC curve, LTPD, AOQL)
  • Has a customer demanding c = 0 sampling

Inspection levels per part and supplier: incoming-inspection-plan-writer.

Workflow

text
1. CLASSIFY -> characteristics as critical / major / minor; critical -> 100% or error-proofing, not sampling
2. AQL      -> per class (customer AQLs when given): major 0.65-1.0, minor 2.5-4.0
3. PLAN     -> python scripts/z14_plan.py --lot 1000 --aql 1.0 [--level II]
4. CHECK    -> python scripts/oc_curve.py oc --n 80 --c 2 --lot 1000   (is the LTPD acceptable?)
5. DESIGN   -> if not: python scripts/oc_curve.py design --aql 0.01 --ltpd 0.05, or c0 --ltpd 0.05
6. RUN      -> random sample from the whole lot; record; apply switching rules

Examples

text
Lot 200, inspection level II -> code letter G (n = 32)
Table II-A arrow (down) -> use the plan for code letter H
Normal inspection, single sampling: n = 50, Ac = 1, Re = 2
text
Plan n = 80, c = 2 (binomial)
  Pa = 0.95 at p = 1.0298%   (producer's quality level)
  Pa = 0.10 at p = 6.5160%   (LTPD / consumer's quality level)

Code-letter table, common plans, inspection levels, switching rules and related standards: z14-and-switching.md. When to sample, AQL by defect class, OC interpretation, designing from risks, c = 0 plans and executing the plan: choosing-a-plan.md.

Output Format

Deliver:

  1. Characteristic classes and the AQL for each.
  2. Plan - code letter, n, Ac, Re (and any arrow followed).
  3. Protection - producer's quality level, LTPD and AOQL from the OC curve.
  4. Decision rule and switching - accept/reject, what happens to rejected lots, when to tighten.

Scripts

bash
python scripts/z14_plan.py --lot 1000 --aql 1.0
python scripts/z14_plan.py --lot 5000 --aql 0.65 --level S-3
python scripts/z14_plan.py --lot 1000 --aql 25 --per-100-units

Normal inspection only; tightened and reduced plans are in Tables II-B and II-C of the standard. Exit codes: 0 plan printed, 2 invalid lot, AQL or level.

bash
python scripts/oc_curve.py oc --n 80 --c 2 [--lot 1000] [--svg > oc.svg]
python scripts/oc_curve.py design --aql 0.01 --ltpd 0.05 --alpha 0.05 --beta 0.10
python scripts/oc_curve.py c0 --ltpd 0.05 --beta 0.10

Exit codes: 0 computed, 1 no plan within limits, 2 usage error.

Additional Resources

FileContent
z14-and-switching.mdCode letters, sample sizes, common plans, inspection levels, switching rules, related standards
choosing-a-plan.mdWhen to sample, AQL selection, OC curves, risk-based design, c = 0 plans, execution
More in Quality Management & ISO 9001

8d-problem-solving-report-writer

Write and review 8D problem-solving reports for customer complaints and serious nonconformities (automotive and aerospace practice: Ford Global 8D, VDA, GM, Stellantis formats): D0 emergency response, D1 cross-functional team and champion, D2 problem description with 5W2H and is / is-not and no cause in the statement, D3 interim containment within 24 hours with verification and clean point, D4 verified occurrence and escape (non-detection) root causes plus systemic cause, D5 permanent corrective actions for each cause verified before implementation, D6 implementation, validation with production data and removal of containment, D7 PFMEA, control plan and read-across to similar products, D8 closure and recognition. Checks an 8D discipline by discipline for missing content, human-error root causes, missing escape cause or action, late containment and dates out of order.

approved-supplier-list-manager

Manage and audit an approved supplier list (ASL) / external provider register for ISO 9001 8.4.1, IATF 16949 8.4 and AS9100 8.4.1: supplier status (approved, conditional, probation, pending, disqualified), scope of approval by commodity and process, risk class, certification and expiry, re-evaluation intervals by risk, conditions with end dates, single-source contingency, approver and customer-directed sources. Audits the list for expired or expiring certificates, overdue re-evaluations, conditional or probation status past its decision date, high-risk suppliers without the required certification, single-source suppliers without backup and missing approvers, and checks purchase orders for suppliers that are off-list, disqualified or pending, or buying outside the approved scope. Covers ERP blocks, PO requirements, off-list and emergency purchases.

apqp-phase-planner

Plan and track Advanced Product Quality Planning (AIAG APQP 3rd edition, IATF 16949) for a new or changed automotive part: back-schedule the five phases (plan and define, product design, process design, product and process validation, launch and feedback) from the start-of-production date by program complexity, with overlap, PPAP lead and safe-launch period; list the deliverables and gate for each phase (DFMEA, DVP&R, feasibility, process flow, PFMEA, control plans, MSA, Ppk, run at rate, PPAP, safe launch, lessons learned); adjust for build-to-print suppliers; flag compressed timelines and late or untracked deliverables against a status list. Covers gate reviews, red/yellow/green status reporting, run at rate and safe-launch exit criteria.

as9100-gap-analyzer

Run an AS9100D / EN 9100:2018 gap analysis for aviation, space and defence suppliers on the requirements added to ISO 9001: on-time delivery and conformity focus, management representative, ethics and human-factors awareness, operational planning and operational risk management, configuration management, product safety, counterfeit-part prevention, special requirements, critical items and key characteristics, external provider register and flow-down, FOD prevention, tooling and NC program control, special process validation, first article inspection (AS9102), traceability, in-service data and nonconforming product control. Generates and scores a worksheet, grades missing core controls as major, and checks invalid n/a claims. Covers AS9101/AS9104, OASIS, AS9102 FAI forms, counterfeit standards (AS5553, AS6174, AS6081), NADCAP and the planned IA9100 transition.

audit-report-writer

Write internal, supplier and pre-certification audit reports with the content ISO 19011:2018 6.5 expects: audit objectives, scope, criteria with revisions, dates, team and auditees, method and sampling statement, specific strengths, findings table and three-part finding details (requirement, evidence, statement), conclusion on the degree of fulfilment of criteria, diverging opinions, follow-up deadlines and distribution. Builds a Markdown report from a JSON audit record, generates the conclusion from the findings (major / minor / none) and flags reports missing required content or findings without clause or evidence. Covers conclusion wording, closing meetings, response expectations and verifying corrective actions.

capa-effectiveness-checker

Verify whether a corrective action actually worked (ISO 9001 10.2.1 d, IATF 16949, 8D D6) with statistics instead of 'no complaints so far': before/after defect-rate comparison with an exact conditional binomial test for Poisson counts and a minimum practical reduction, zero-defect demonstration size (n = ln(1-C)/ln(1-p), rule of three) with progress so far, and exact Clopper-Pearson upper bounds on the post-action defect rate. Returns effective, not yet demonstrated (with the units still needed) or not effective. Covers setting effectiveness criteria when the CAPA is opened, choosing the window by problem frequency, leading indicators for rare failures (Cpk, SPC stability, error-proofing checks, LPA), and traps such as volume changes, detection changes and containment masking.