document-control-system-designer

Design and audit a document control system for ISO 9001:2015 clause 7.5 (and IATF 16949 / AS9100 / ISO 13485 variants): document hierarchy, document vs record, numbering scheme with separate revision, master list / document register fields, review and approval workflow, change control, point-of-use control, obsolete document withdrawal, external documents (standards, customer drawings), electronic systems (SharePoint, eQMS) and record retention schedules. Designs a numbering scheme and validates existing IDs (duplicates, revision letters in IDs, next free number), and audits a document register for duplicate or multiple approved revisions, missing approvals, obsolete copies at points of use, overdue reviews, self-approval, missing revisions, records without retention and stale external documents. Use when setting up document control, migrating to an eQMS, cleaning up a master list before an audit, or after findings about uncontrolled or obsolete documents.

Manufacturing & Industrial Operations / Quality Management & ISO 9001v1.0.0Updated OCT 25 20262 references2 scripts

Document control has one job: the right revision is in the right place, approved by the right person, and the evidence (records) survives as long as it is needed. scripts/numbering_scheme.py designs and checks document IDs; scripts/register_audit.py audits the master list for the failures auditors find most.

Trigger Conditions

Activate this skill when the user:

  • Is setting up document control for a new QMS or migrating to SharePoint / an eQMS
  • Needs a numbering scheme, master list, review cycle or retention schedule
  • Has audit findings about obsolete documents at workstations, missing approvals or uncontrolled copies
  • Asks "document or record?", "how long do we keep inspection records?", "how do we control customer drawings?"

Workflow

text
1. HIERARCHY -> decide document types (manual, procedures, WIs, forms, specs, external, record series)
2. NUMBERING -> python scripts/numbering_scheme.py --types QM QP WI QF EXT REC [--areas PRD QA]
3. REGISTER  -> build the master list with the columns in register-and-numbering.md
4. WORKFLOW  -> draft -> review -> independent approval -> issue -> periodic review -> obsolete
5. RETENTION -> set retention per record series from customer, legal and standard requirements
6. AUDIT     -> python scripts/register_audit.py register.csv --today YYYY-MM-DD --pattern '<regex>'
7. FLOOR     -> walk the points of use; compare revisions at stations against the register

Design Decisions

DecisionRecommendation
ID formatTYPE-NNN or TYPE-AREA-NNN; revision held separately
ApprovalSomeone other than the author; record name and date
DistributionPortal with only approved versions visible; prints marked uncontrolled or dated
Point of useLocation list per document; swap on revision; QR links at stations
External documentsIn the register (type EXT) with source and yearly currency check
Review cycle12 months for manual/external, 24 months for procedures and WIs
RecordsRetention per series, protected from change, retrievable, disposed of on schedule

Lifecycle, electronic-system criteria, point-of-use controls and a retention table: document-lifecycle.md. Register columns, numbering rules, revision conventions and review intervals: register-and-numbering.md.

Register Audit Codes (register_audit.py)

CodeSeverityFinding
DC001highSame doc and revision listed twice
DC002highTwo approved revisions at once
DC003highApproved without approver or date
DC004highObsolete document still at points of use
DC005mediumPeriodic review overdue
DC006mediumApproved by its own owner
DC007mediumNo revision
DC008mediumRecord series without retention
DC009lowExternal document currency check overdue
DC010lowID breaks the numbering pattern
text
DC002 [high] QP-007: revisions C, D all approved; obsolete the old one
DC004 [high] WI-010: obsolete but still at: Lathe 3 station; withdraw or mark OBSOLETE

Output Format

Deliver:

  1. Document hierarchy and types with ID format and examples.
  2. Register template and the review/approval workflow (who drafts, reviews, approves; intervals).
  3. Retention schedule per record series with the requirement driving it.
  4. Audit result of the current register and a cleanup list (high findings first).
  5. Point-of-use plan - how revisions reach and leave the shop floor.

Scripts

bash
python scripts/numbering_scheme.py --types QM QP WI QF EXT --areas PRD QA
python scripts/numbering_scheme.py --types QP WI QF --check ids.txt

Exit codes: 0 scheme printed / all IDs valid, 1 duplicate or invalid IDs, 2 bad codes or unreadable file.

bash
python scripts/register_audit.py register.csv --today 2026-10-24
python scripts/register_audit.py register.csv --pattern '^(QM|QP|WI|QF|REC|EXT)-\d{3}$'

Register columns: doc_id, title, type, revision, status, owner, approved_by, approval_date, last_review, review_months, retention, locations. Exit codes: 0 no high findings, 1 high findings, 2 read error.

Additional Resources

FileContent
document-lifecycle.mdDocument vs record, lifecycle and 7.5 controls, electronic systems, point-of-use control, retention table
register-and-numbering.mdRegister columns, numbering rules, revision conventions, review intervals
More in Quality Management & ISO 9001

8d-problem-solving-report-writer

Write and review 8D problem-solving reports for customer complaints and serious nonconformities (automotive and aerospace practice: Ford Global 8D, VDA, GM, Stellantis formats): D0 emergency response, D1 cross-functional team and champion, D2 problem description with 5W2H and is / is-not and no cause in the statement, D3 interim containment within 24 hours with verification and clean point, D4 verified occurrence and escape (non-detection) root causes plus systemic cause, D5 permanent corrective actions for each cause verified before implementation, D6 implementation, validation with production data and removal of containment, D7 PFMEA, control plan and read-across to similar products, D8 closure and recognition. Checks an 8D discipline by discipline for missing content, human-error root causes, missing escape cause or action, late containment and dates out of order.

acceptance-sampling-plan-selector

Select and evaluate acceptance sampling plans for incoming, in-process and final inspection: ANSI/ASQ Z1.4 / ISO 2859-1 single sampling under normal inspection (code letter from lot size and inspection level I, II, III, S-1 to S-4; sample size, Ac and Re from AQL, following the table's arrows to the correct plan; 100% when n reaches the lot size; AQLs above 10 per 100 units), operating characteristic curves (Pa at any quality, producer's quality level, indifference point, LTPD, AOQ and AOQL, binomial or hypergeometric), plans designed from producer and consumer risk, and c = 0 zero-acceptance plans. Covers AQL choice by defect class, switching rules between normal, tightened and reduced inspection, when sampling is not appropriate, and random sampling.

approved-supplier-list-manager

Manage and audit an approved supplier list (ASL) / external provider register for ISO 9001 8.4.1, IATF 16949 8.4 and AS9100 8.4.1: supplier status (approved, conditional, probation, pending, disqualified), scope of approval by commodity and process, risk class, certification and expiry, re-evaluation intervals by risk, conditions with end dates, single-source contingency, approver and customer-directed sources. Audits the list for expired or expiring certificates, overdue re-evaluations, conditional or probation status past its decision date, high-risk suppliers without the required certification, single-source suppliers without backup and missing approvers, and checks purchase orders for suppliers that are off-list, disqualified or pending, or buying outside the approved scope. Covers ERP blocks, PO requirements, off-list and emergency purchases.

apqp-phase-planner

Plan and track Advanced Product Quality Planning (AIAG APQP 3rd edition, IATF 16949) for a new or changed automotive part: back-schedule the five phases (plan and define, product design, process design, product and process validation, launch and feedback) from the start-of-production date by program complexity, with overlap, PPAP lead and safe-launch period; list the deliverables and gate for each phase (DFMEA, DVP&R, feasibility, process flow, PFMEA, control plans, MSA, Ppk, run at rate, PPAP, safe launch, lessons learned); adjust for build-to-print suppliers; flag compressed timelines and late or untracked deliverables against a status list. Covers gate reviews, red/yellow/green status reporting, run at rate and safe-launch exit criteria.

as9100-gap-analyzer

Run an AS9100D / EN 9100:2018 gap analysis for aviation, space and defence suppliers on the requirements added to ISO 9001: on-time delivery and conformity focus, management representative, ethics and human-factors awareness, operational planning and operational risk management, configuration management, product safety, counterfeit-part prevention, special requirements, critical items and key characteristics, external provider register and flow-down, FOD prevention, tooling and NC program control, special process validation, first article inspection (AS9102), traceability, in-service data and nonconforming product control. Generates and scores a worksheet, grades missing core controls as major, and checks invalid n/a claims. Covers AS9101/AS9104, OASIS, AS9102 FAI forms, counterfeit standards (AS5553, AS6174, AS6081), NADCAP and the planned IA9100 transition.

audit-report-writer

Write internal, supplier and pre-certification audit reports with the content ISO 19011:2018 6.5 expects: audit objectives, scope, criteria with revisions, dates, team and auditees, method and sampling statement, specific strengths, findings table and three-part finding details (requirement, evidence, statement), conclusion on the degree of fulfilment of criteria, diverging opinions, follow-up deadlines and distribution. Builds a Markdown report from a JSON audit record, generates the conclusion from the findings (major / minor / none) and flags reports missing required content or findings without clause or evidence. Covers conclusion wording, closing meetings, response expectations and verifying corrective actions.