Skip to content
v0.1.3latest release121 skills4 categories6 sub-categories247 tested scripts397 reference docsContact us

ANSI/ASQ Z1.4 (ISO 2859-1) Quick Reference

Reference for acceptance-sampling-plan-selector · 66 lines

Manufacturing & Industrial Operations / Quality Management & ISO 9001v1.0.0Updated OCT 25 20262 references2 scripts

Table I: code letters

Lot sizeS-1S-2S-3S-4IIIIII
2-8AAAAAAB
9-15AAAAABC
16-25AABBBCD
26-50ABBCCDE
51-90BBCCCEF
91-150BBCDDFG
151-280BCDEEGH
281-500BCDEFHJ
501-1,200CCEFGJK
1,201-3,200CDEGHKL
3,201-10,000CDFGJLM
10,001-35,000CDFHKMN
35,001-150,000DEGJLNP
150,001-500,000DEGJMPQ
500,001 and overDEHKNQR

Sample sizes by letter: A 2, B 3, C 5, D 8, E 13, F 20, G 32, H 50, J 80, K 125, L 200, M 315, N 500, P 800, Q 1250, R 2000.

Common normal-inspection plans (level II)

Lot sizeLetternAQL 0.65AQL 1.0AQL 1.5AQL 2.5AQL 4.0
91-150F2020 / 013 / 032 / 120 / 120 / 2
281-500H5080 / 150 / 150 / 250 / 350 / 5
501-1,200J8080 / 180 / 280 / 380 / 580 / 7
1,201-3,200K125125 / 2125 / 3125 / 5125 / 7125 / 10
3,201-10,000L200200 / 3200 / 5200 / 7200 / 10200 / 14

Entries are n / Ac (Re = Ac + 1). Where an arrow applies, the sample size changes: always run z14_plan.py rather than reading across a row by eye.

Inspection levels

LevelUse
IIDefault
ILess discrimination needed, cheaper inspection
IIIMore discrimination (critical customers, history of problems)
S-1 to S-4Small samples for expensive or destructive tests, accepting larger risks

Switching rules (normal / tightened / reduced)

FromToCondition
NormalTightened2 of 5 or fewer consecutive lots rejected on original inspection
TightenedNormal5 consecutive lots accepted on original inspection
NormalReducedSwitching score >= 30, steady production, and the responsible authority approves (optional)
ReducedNormalA lot rejected, irregular production, or other conditions warrant
TightenedDiscontinue5 consecutive lots remain on tightened inspection: stop acceptance under the standard until the supplier improves

Without the switching rules, Z1.4 plans give much weaker protection than intended. Tightened and reduced plans are in Tables II-B and II-C of the standard.

ANSI/ASQ Z1.9 / ISO 3951 (variables sampling, smaller samples for measured characteristics); ISO 2859-2 (isolated lots, LQ-indexed); c = 0 plans (Squeglia) used by many automotive and defence customers who do not accept any nonconforming units in the sample.

More in Quality Management & ISO 9001

8d-problem-solving-report-writer

Write and review 8D problem-solving reports for customer complaints and serious nonconformities (automotive and aerospace practice: Ford Global 8D, VDA, GM, Stellantis formats): D0 emergency response, D1 cross-functional team and champion, D2 problem description with 5W2H and is / is-not and no cause in the statement, D3 interim containment within 24 hours with verification and clean point, D4 verified occurrence and escape (non-detection) root causes plus systemic cause, D5 permanent corrective actions for each cause verified before implementation, D6 implementation, validation with production data and removal of containment, D7 PFMEA, control plan and read-across to similar products, D8 closure and recognition. Checks an 8D discipline by discipline for missing content, human-error root causes, missing escape cause or action, late containment and dates out of order.

approved-supplier-list-manager

Manage and audit an approved supplier list (ASL) / external provider register for ISO 9001 8.4.1, IATF 16949 8.4 and AS9100 8.4.1: supplier status (approved, conditional, probation, pending, disqualified), scope of approval by commodity and process, risk class, certification and expiry, re-evaluation intervals by risk, conditions with end dates, single-source contingency, approver and customer-directed sources. Audits the list for expired or expiring certificates, overdue re-evaluations, conditional or probation status past its decision date, high-risk suppliers without the required certification, single-source suppliers without backup and missing approvers, and checks purchase orders for suppliers that are off-list, disqualified or pending, or buying outside the approved scope. Covers ERP blocks, PO requirements, off-list and emergency purchases.

apqp-phase-planner

Plan and track Advanced Product Quality Planning (AIAG APQP 3rd edition, IATF 16949) for a new or changed automotive part: back-schedule the five phases (plan and define, product design, process design, product and process validation, launch and feedback) from the start-of-production date by program complexity, with overlap, PPAP lead and safe-launch period; list the deliverables and gate for each phase (DFMEA, DVP&R, feasibility, process flow, PFMEA, control plans, MSA, Ppk, run at rate, PPAP, safe launch, lessons learned); adjust for build-to-print suppliers; flag compressed timelines and late or untracked deliverables against a status list. Covers gate reviews, red/yellow/green status reporting, run at rate and safe-launch exit criteria.

as9100-gap-analyzer

Run an AS9100D / EN 9100:2018 gap analysis for aviation, space and defence suppliers on the requirements added to ISO 9001: on-time delivery and conformity focus, management representative, ethics and human-factors awareness, operational planning and operational risk management, configuration management, product safety, counterfeit-part prevention, special requirements, critical items and key characteristics, external provider register and flow-down, FOD prevention, tooling and NC program control, special process validation, first article inspection (AS9102), traceability, in-service data and nonconforming product control. Generates and scores a worksheet, grades missing core controls as major, and checks invalid n/a claims. Covers AS9101/AS9104, OASIS, AS9102 FAI forms, counterfeit standards (AS5553, AS6174, AS6081), NADCAP and the planned IA9100 transition.

audit-report-writer

Write internal, supplier and pre-certification audit reports with the content ISO 19011:2018 6.5 expects: audit objectives, scope, criteria with revisions, dates, team and auditees, method and sampling statement, specific strengths, findings table and three-part finding details (requirement, evidence, statement), conclusion on the degree of fulfilment of criteria, diverging opinions, follow-up deadlines and distribution. Builds a Markdown report from a JSON audit record, generates the conclusion from the findings (major / minor / none) and flags reports missing required content or findings without clause or evidence. Covers conclusion wording, closing meetings, response expectations and verifying corrective actions.

capa-effectiveness-checker

Verify whether a corrective action actually worked (ISO 9001 10.2.1 d, IATF 16949, 8D D6) with statistics instead of 'no complaints so far': before/after defect-rate comparison with an exact conditional binomial test for Poisson counts and a minimum practical reduction, zero-defect demonstration size (n = ln(1-C)/ln(1-p), rule of three) with progress so far, and exact Clopper-Pearson upper bounds on the post-action defect rate. Returns effective, not yet demonstrated (with the units still needed) or not effective. Covers setting effectiveness criteria when the CAPA is opened, choosing the window by problem frequency, leading indicators for rare failures (Cpk, SPC stability, error-proofing checks, LPA), and traps such as volume changes, detection changes and containment masking.