Disposition options

DispositionMeaningRequired before release
ReworkMake the item conform to the original requirement (re-machine, re-test)Approved rework instruction; re-inspection to the original requirement
RepairMake it acceptable for use though still not conforming to the drawing (weld repair, sleeve)Concession from the customer / design authority; re-inspection to the repair spec
Use-as-isAccept the nonconformity unchangedConcession from the customer / design authority; record the authority
ScrapDestroy so it cannot be usedMutilation or controlled scrap bin; record quantity
Return to supplierSend back for credit, rework or replacementSupplier notified; SCAR if systemic
RegradeUse for another application where it meets requirementsEngineering approval; re-identify the part

ISO 9001 8.7.1 allows correction, segregation/containment/return/suspension, informing the customer and acceptance under concession; 8.7.2 requires records of the nonconformity, actions, concessions and the authority deciding. IATF 16949 8.7.1.1 requires customer authorization before shipping product that deviates (including repair and use-as-is) and 8.7.1.4-8.7.1.5 controls rework and repair with documented processes and customer approval for repair. AS9100 8.7.1 prohibits use-as-is or repair dispositions by the organization when the customer owns the design, unless the design authority authorizes it.

Material review board (MRB)

RoleContributes
Quality engineer (chair)Requirement, evidence, risk of escape
Manufacturing / process engineerRework feasibility, cause hypotheses
Design engineer (if design authority)Fit, form, function impact for use-as-is / repair
Customer representativeConcession approval when required

Decide within a set time (e.g. 2 working days) so suspect material does not pile up. Record each member's role, not only signatures.

Concessions and deviations

TermTimingExample
Concession (waiver)After manufacture: accept specific nonconforming items40 parts with bore 12.020 accepted by customer
Deviation permitBefore manufacture: produce differently for a limited quantity or timeUse alternative material for 2 lots

A concession states: part, quantity, serials/lots, nonconformity, justification, limits, expiry, approver, and how the items are identified when shipped.

Scrap control

Scrap must not re-enter the process: mutilate safety parts, use locked red bins, reconcile scrap quantities with NCRs, and record scrap cost in the NCR for cost-of-poor-quality reporting.

More in Quality Management & ISO 9001

8d-problem-solving-report-writer

Write and review 8D problem-solving reports for customer complaints and serious nonconformities (automotive and aerospace practice: Ford Global 8D, VDA, GM, Stellantis formats): D0 emergency response, D1 cross-functional team and champion, D2 problem description with 5W2H and is / is-not and no cause in the statement, D3 interim containment within 24 hours with verification and clean point, D4 verified occurrence and escape (non-detection) root causes plus systemic cause, D5 permanent corrective actions for each cause verified before implementation, D6 implementation, validation with production data and removal of containment, D7 PFMEA, control plan and read-across to similar products, D8 closure and recognition. Checks an 8D discipline by discipline for missing content, human-error root causes, missing escape cause or action, late containment and dates out of order.

acceptance-sampling-plan-selector

Select and evaluate acceptance sampling plans for incoming, in-process and final inspection: ANSI/ASQ Z1.4 / ISO 2859-1 single sampling under normal inspection (code letter from lot size and inspection level I, II, III, S-1 to S-4; sample size, Ac and Re from AQL, following the table's arrows to the correct plan; 100% when n reaches the lot size; AQLs above 10 per 100 units), operating characteristic curves (Pa at any quality, producer's quality level, indifference point, LTPD, AOQ and AOQL, binomial or hypergeometric), plans designed from producer and consumer risk, and c = 0 zero-acceptance plans. Covers AQL choice by defect class, switching rules between normal, tightened and reduced inspection, when sampling is not appropriate, and random sampling.

approved-supplier-list-manager

Manage and audit an approved supplier list (ASL) / external provider register for ISO 9001 8.4.1, IATF 16949 8.4 and AS9100 8.4.1: supplier status (approved, conditional, probation, pending, disqualified), scope of approval by commodity and process, risk class, certification and expiry, re-evaluation intervals by risk, conditions with end dates, single-source contingency, approver and customer-directed sources. Audits the list for expired or expiring certificates, overdue re-evaluations, conditional or probation status past its decision date, high-risk suppliers without the required certification, single-source suppliers without backup and missing approvers, and checks purchase orders for suppliers that are off-list, disqualified or pending, or buying outside the approved scope. Covers ERP blocks, PO requirements, off-list and emergency purchases.

apqp-phase-planner

Plan and track Advanced Product Quality Planning (AIAG APQP 3rd edition, IATF 16949) for a new or changed automotive part: back-schedule the five phases (plan and define, product design, process design, product and process validation, launch and feedback) from the start-of-production date by program complexity, with overlap, PPAP lead and safe-launch period; list the deliverables and gate for each phase (DFMEA, DVP&R, feasibility, process flow, PFMEA, control plans, MSA, Ppk, run at rate, PPAP, safe launch, lessons learned); adjust for build-to-print suppliers; flag compressed timelines and late or untracked deliverables against a status list. Covers gate reviews, red/yellow/green status reporting, run at rate and safe-launch exit criteria.

as9100-gap-analyzer

Run an AS9100D / EN 9100:2018 gap analysis for aviation, space and defence suppliers on the requirements added to ISO 9001: on-time delivery and conformity focus, management representative, ethics and human-factors awareness, operational planning and operational risk management, configuration management, product safety, counterfeit-part prevention, special requirements, critical items and key characteristics, external provider register and flow-down, FOD prevention, tooling and NC program control, special process validation, first article inspection (AS9102), traceability, in-service data and nonconforming product control. Generates and scores a worksheet, grades missing core controls as major, and checks invalid n/a claims. Covers AS9101/AS9104, OASIS, AS9102 FAI forms, counterfeit standards (AS5553, AS6174, AS6081), NADCAP and the planned IA9100 transition.

audit-report-writer

Write internal, supplier and pre-certification audit reports with the content ISO 19011:2018 6.5 expects: audit objectives, scope, criteria with revisions, dates, team and auditees, method and sampling statement, specific strengths, findings table and three-part finding details (requirement, evidence, statement), conclusion on the degree of fulfilment of criteria, diverging opinions, follow-up deadlines and distribution. Builds a Markdown report from a JSON audit record, generates the conclusion from the findings (major / minor / none) and flags reports missing required content or findings without clause or evidence. Covers conclusion wording, closing meetings, response expectations and verifying corrective actions.